CodeChronicle

OBC 2006 Division B

8.2.1.4.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · continues from 8.2.1.4. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

OBC 2012 · continues as 8.2.1.4. — Pro

8.2.1.4. — Clearances

(1) Unless it can be shown to be unnecessary, where the percolation time is 10 minutes or greater, the location of all components within a sewage system shall be in conformance with the clearances listed in Articles 8.2.1.5. or 8.2.1.6.v1

(2) Unless it can be shown to be unnecessary, where the percolation time is less than 10 minutes, the clearances listed in Articles 8.2.1.5. and 8.2.1.6.v1 for wells, lakes, ponds, reservoirs, rivers, springs or streams shall be increased to compensate for the lower percolation time.

(3) No building shall be constructed closer to any part of a sewage system than the clearances listed in Articles 8.2.1.5. or 8.2.1.6.v1

(4) If more than one sewage system is located on a lot or parcel of land, there shall be no overlap of any part of the systems.

Editor's note

This map follows the as-filed text of O. Reg. 350/06 for Article 8.2.1.4. of Division B, in which Sentences (1) and (3) refer to the clearances listed in 'Articles 8.2.1.5. or 8.2.1.6.' using the plural 'Articles', because the reference is to two articles. The e-Laws consolidation editorially renders both references in the singular as 'Article 8.2.1.5. or 8.2.1.6.', with no amending regulation making the change. This map preserves the as-filed wording.