(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 9.16.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
Provenance
OBC 1997 · continues from 9.16. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
OBC 2012 · continues as 9.16. — Pro
9.16. — Floors-on-Ground
Content not available for this version.
9.16.1. — Scope
Content not available for this version.
9.16.1.1. — Application
(1) This Section applies to floors that are supported on ground or granular fill and that do not provide structural support for the superstructure.
Text · e-Laws consolidated snapshot
9.16.1.2. — Structural Floor Slabs
(1) Floors-on-ground that support loads from the superstructure shall be designed in conformance with Part 4.
Text · e-Laws consolidated snapshot
9.16.1.3. — Required Floors-on-Ground
(1) All spaces within dwelling units, except crawl spaces, shall be provided with a floor-on-ground, where,
(a) access is provided to the space, and
(b) a floor supported by the structure is not provided.
Text · e-Laws consolidated snapshot
9.16.1.4. — Dampproofing and Waterproofing
(1) Dampproofing and waterproofing shall conform to Section 9.13.
Text · e-Laws consolidated snapshot
9.16.2. — Material Beneath Floors
Content not available for this version.
9.16.2.1. — Required Installation of Granular Fill
(1) Except as provided in Sentence (2), not less than 100 mm of coarse clean granular material containing not more than 10% of material that will pass a 4 mm sieve shall be placed beneath floors-on-ground.
(2) Granular material need not be installed under,
(a) slabs in garages, carports or accessory buildings, or
(b) buildings of industrial occupancy where the nature of the process contained in the occupancy permits or requires the use of large openings in the building envelope even during the winter.
Text · e-Laws consolidated snapshot
9.16.2.2. — Support of Floors
(1) Material that is susceptible to changes in volume due to variations in moisture content or chemical-microbiological oxidation shall not be used as fill beneath floors-on-ground in a concentration that will damage the building to a degree that would adversely affect its stability or the performance of assemblies separating dissimilar environments.
(2) Material that is susceptible to changes in volume due to freezing shall not be used as fill beneath floors-on-ground that will be subjected to freezing temperatures.
(3) Except as provided in Sentence (4), fill beneath floors-on-ground shall be compacted.
(4) Fill beneath floors-on-ground need not be compacted where the material is clean coarse aggregate containing not more than 10% of material that will pass a 4 mm sieve.
Text · e-Laws consolidated snapshot
9.16.3. — Drainage
Content not available for this version.
9.16.3.1. — Control of Water Ingress
(1) Except as provided in Article 9.16.3.2. or where it can be shown to be unnecessary, ingress of water underneath a floor-on-ground shall be prevented by grading or drainage.
Text · e-Laws consolidated snapshot
9.16.3.2. — Hydrostatic Pressure
(1) Where groundwater levels may cause hydrostatic pressure beneath a floor-on-ground, the floor-on-ground shall be,
(a) a cast-in-place concrete slab, and
(b) designed to resist such pressures.
Text · e-Laws consolidated snapshot
9.16.3.3. — Floor Drains
(1) When floor drains are required, the floor surface shall be sloped so that no water can accumulate.
Text · e-Laws consolidated snapshot
9.16.4. — Concrete
Content not available for this version.
9.16.4.1. — Surface Finish
(1) The finished surface of concrete floor slabs shall be trowelled smooth and even.
(2) Dry cement shall not be added to the floor surfaces to absorb surplus water.
Text · e-Laws consolidated snapshot
9.16.4.2. — Topping Course
(1) Where a topping course is provided for a concrete floor slab, it shall consist of 1 part cement to 2.5 parts clean, well graded sand by volume, with a water/cement ratio approximately equal to that of the base slab.
(2) When concrete topping is provided it shall not be less than 20 mm thick.
Text · e-Laws consolidated snapshot
9.16.4.3. — Thickness
(1) Concrete slabs shall be not less than 75 mm thick exclusive of concrete topping.
Text · e-Laws consolidated snapshot
9.16.4.4. — Bond Break
(1) A bond-breaking material shall be placed between the slab and footings or rock.
Text · e-Laws consolidated snapshot
9.16.4.5. — Compressive Strength
(1) Where dampproofing is not provided the concrete used for floors-on-ground shall have a compressive strength of not less than 25 MPa after 28 days.
(2) Where dampproofing is provided as described in Article 9.13.2.7., the concrete used for floors-on-ground shall have a compressive strength of not less than 15 MPa after 28 days.
Text · e-Laws consolidated snapshot
9.16.5. — Wood
Content not available for this version.
9.16.5.1. — Wood Frame Floors
(1) Floors-on-ground constructed of wood shall conform to CAN/CSA-S406, “Construction of Preserved Wood Foundations”.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · continues from 9.16. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
OBC 2012 · continues as 9.16. — Pro