(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 9.13.2.7.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
Provenance
OBC 1997 · merged from 9.13.4.1. — Pro
OBC 1997 · merged from 9.13.4.2. — Pro
OBC 1997 · merged from 9.13.4.3. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
OBC 2012 · continues as 9.13.2.7. — Pro
9.13.2.7. — Dampproofing of Floors-on-Ground
(1) Where floors are dampproofed, the dampproofing shall be installed below the floor, except that where a separate floor is provided over a slab, the dampproofing is permitted to be applied to the top of the slab.
(2) Where installed below the floor, dampproofing membranes shall consist of polyethylene not less than 0.15 mm thick, or type S roll roofing.
(3) Joints in dampproofing membranes described in Sentence (2) shall be lapped not less than 100 mm.
(4) Where installed above the slab, dampproofing shall consist of,
(a) no fewer than 2 mopped-on coats of bitumen,
(b) not less than 0.05 mm polyethylene, or
(c) other material providing equivalent performance.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · merged from 9.13.4.1. — Pro
OBC 1997 · merged from 9.13.4.2. — Pro
OBC 1997 · merged from 9.13.4.3. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
OBC 2012 · continues as 9.13.2.7. — Pro