CodeChronicle

OBC 2006 Division B

8.2.1.2.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · continues from 8.2.1.2. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

O. Reg. 137/07, cl. 40 · ext v1 →

In force 2007-04-02

Next: O. Reg. 137/07, cl. 40 · ext (not in force until 2007-04-02) v1 →

OBC 2012 · continues as 8.2.1.2. — Pro

8.2.1.2. — Site Evaluation

Comparing versions

Changed text stands out · unchanged is dimmed

v0 base

Earlier · viewing · 2006-12-31

(1) A site evaluation shall be conducted on every site where a new or replacement sewage system is to be installed.

(2) The percolation time shall be determined by either percolation tests or by classifying the soil according to the Unified Soil Classification System as described in Supplementary Standard SB-5.

(3) Where the percolation time is determined by a percolation test, there shall be a minimum of 3 locations selected, suitably spaced to accurately evaluate the leaching bed area, with the highest percolation time of the tests being used

v1 O. Reg. 137/07

Later · 2007-04-02

(1) A site evaluation shall be conducted on every site where a new or replacement sewage system is to be installed.

(2) The percolation time shall be determined by either percolation tests or by classifying the soil according to the Unified Soil Classification System as described in Supplementary Standard SB-6.

(3) Where the percolation time is determined by a percolation test, there shall be a minimum of 3 locations selected, suitably spaced to accurately evaluate the leaching bed area, with the highest percolation time of the tests being used