OBC 2006 › Division B
8.2.1.2.
Version 0 — in force 31 December 2006
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 8.2.1.2.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
80. (1) Subject to subsection (2), this Regulation comes into force on the day it is filed.
Read directly from the regulation's own commencement section.
O. Reg. 137/07 · commencement 80(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 8.2.1.2.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
80. (1) Subject to subsection (2), this Regulation comes into force on the day it is filed.
Read directly from the regulation's own commencement section.
O. Reg. 137/07 · commencement 80(1)
Provenance
OBC 1997 · continues from 8.2.1.2. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 137/07, cl. 40 · ext v1 →
In force 2007-04-02
Next: O. Reg. 137/07, cl. 40 · ext (not in force until 2007-04-02) v1 →
OBC 2012 · continues as 8.2.1.2. — Pro
8.2.1.2. — Site Evaluation
(1) A site evaluation shall be conducted on every site where a new or replacement sewage system is to be installed.
(2) The percolation time shall be determined by either percolation tests or by classifying the soil according to the Unified Soil Classification System as described in Supplementary Standard SB-5.
(3) Where the percolation time is determined by a percolation test, there shall be a minimum of 3 locations selected, suitably spaced to accurately evaluate the leaching bed area, with the highest percolation time of the tests being used
Editor's note
This map follows the as-filed text of O. Reg. 350/06 for Article 8.2.1.2. of Division B, in which Sentence (3) ('... with the highest percolation time of the tests being used') ends without a sentence-ending period. The e-Laws consolidation editorially adds a terminal period, with no amending regulation making the change. This map preserves the as-filed wording.
Provenance
OBC 1997 · continues from 8.2.1.2. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 137/07, cl. 40 · ext v1 →
In force 2007-04-02 compare
Next: O. Reg. 137/07, cl. 40 · ext (not in force until 2007-04-02) v1 →
OBC 2012 · continues as 8.2.1.2. — Pro