OBC 2006 › Division B
9.13.2.4.
Version 1 — in force 1 January 2010
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 9.13.2.4.
- Version
- v1
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 9.13.2.4.
- Version
- v1
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
Provenance
OBC 1997 · renumbered from 9.13.3.1. — Pro
Base · O. Reg. 350/06 · ext v0 →
O. Reg. 503/09, cl. 153(2) · ext ← current
In force 2010-01-01
OBC 2012 · continues as 9.13.2.4. — Pro
9.13.2.4. — Preparation of Surface
(1) Unit masonry walls to be dampproofed shall be,
(a) parged on the exterior face below ground level with not less than 6 mm of mortar conforming to Section 9.20., and
(b) coved over the footing when the first course of block is laid.
(2) Concrete walls to be dampproofed shall have holes and recesses resulting from the removal of form ties sealed with cement mortar or dampproofing material.
(3) The surface of insulating concrete form walls to be dampproofed shall be repaired and free of projections and depressions that could be detrimental to the performance of the membrane to be applied.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · renumbered from 9.13.3.1. — Pro
Base · O. Reg. 350/06 · ext v0 → compare
O. Reg. 503/09, cl. 153(2) · ext ← current
In force 2010-01-01
OBC 2012 · continues as 9.13.2.4. — Pro