(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 9.13.2.4.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
Provenance
OBC 1997 · renumbered from 9.13.3.1. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 503/09, cl. 153(2) · ext v1 →
In force 2010-01-01
Next: O. Reg. 503/09, cl. 153(2) · ext (not in force until 2010-01-01) v1 →
OBC 2012 · continues as 9.13.2.4. — Pro
9.13.2.4. — Preparation of Surface
(1) Unit masonry walls that are to be dampproofed shall be,
(a) parged on the exterior face below ground level with not less than 6 mm of mortar conforming to Section 9.20., and
(b) coved over the footing when the first course of block is laid.
(2) Concrete walls to be dampproofed shall have holes and recesses resulting from the removal of form ties sealed with cement mortar or dampproofing material.
(3) The surface of insulating concrete form walls that are to be dampproofed shall be repaired and free of projections and depressions that could lead to detrimental to the performance of the membrane to be applied.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · renumbered from 9.13.3.1. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 503/09, cl. 153(2) · ext v1 →
In force 2010-01-01 compare
Next: O. Reg. 503/09, cl. 153(2) · ext (not in force until 2010-01-01) v1 →
OBC 2012 · continues as 9.13.2.4. — Pro