CodeChronicle

OBC 2006 Division B

9.12.3.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · continues from 9.12.3. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

OBC 2012 · continues as 9.12.3. — Pro

9.12.3. — Backfill

Content not available for this version.

9.12.3.1. — Placement of Backfill

(1) Backfill shall be placed to avoid damaging the foundation wall, the drainage tile, drainage layer, externally applied thermal insulation, waterproofing and dampproofing of the wall.

Text · e-Laws consolidated snapshot

9.12.3.2. — Grading of Backfill

(1) Backfill shall be graded to prevent drainage towards the foundation after settling.

Text · e-Laws consolidated snapshot

9.12.3.3. — Deleterious Debris and Boulders

(1) Backfill within 600 mm of the foundation shall be free of deleterious debris and boulders larger than 250 mm diam.

(2) Except as permitted in Sentence (3), backfill shall not contain pyritic material or material that is susceptible to ice lensing in concentrations that will damage the building to a degree that would adversely affect its stability or the performance of assemblies separating dissimilar environments.

(3) Backfill with material of any concentration that is susceptible to ice lensing is permitted where foundation walls are cast-in-place concrete, concrete block insulated on the exterior or concrete block protected from the backfill by a material that serves as a slip plane.

Text · e-Laws consolidated snapshot

9.12.3.4. — Lateral Support of Foundation Wall

(1) Where the height of foundation wall is such that lateral support is required, or where the required concrete strength of the wall has not been reached, the wall shall be braced or laterally supported before backfilling.

Text · e-Laws consolidated snapshot