9.12.1. — General

Content not available for this version.

9.12.1.1. — Removal of Topsoil and Organic Matter

(1) The topsoil and vegetable matter in all unexcavated areas under a building shall be removed.

(2) In localities where termite infestation is known to be a problem, all stumps, roots and other wood debris shall be removed from the soil to a depth of not less than 300 mm in unexcavated areas under a building.

(3) The bottom of every excavation shall be free of all organic material.

Text · e-Laws consolidated snapshot

9.12.1.2. — Standing Water

(1) Excavations shall be kept free of standing water.

Text · e-Laws consolidated snapshot

9.12.1.3. — Protection from Freezing

(1) The bottom of excavations shall be kept from freezing throughout the entire construction period.

Text · e-Laws consolidated snapshot

9.12.1.4. — Precautions During Excavation

(1) Every excavation shall be undertaken in such a manner to prevent damage to adjacent property, existing structures, utilities, roads and sidewalks at all stages of construction.

(2) Material shall not be placed nor shall equipment be operated or placed in or adjacent to an excavation in a manner that may endanger the integrity of the excavation or its supports.