CodeChronicle

OBC 2006 Division B

8.3.3.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · continues from 8.3.3. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

OBC 2012 · continues as 8.3.3. — Pro

8.3.3. — Earth Pit Privy

Content not available for this version.

8.3.3.1. — Construction Requirements

(1) An earth pit privy shall be constructed in the following manner:

(a) the bottom of the pit shall be at least 900 mm above the high ground water table,

(b) the sides of the pit shall be reinforced so as to prevent collapse of them,

(c) the pit shall be surrounded on all sides and on its bottom by not less than 600 mm of soil or leaching bed fill, and

(d) the soil or leaching bed fill around the base of the sides of the superstructure of the earth pit privy shall be raised or mounded to a height of at least 150 mm above ground level.

Text · e-Laws consolidated snapshot