4.1.5.15.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · renumbered from 4.1.10.1. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

O. Reg. 137/07, cl. 31 · ext v1 →

In force 2007-04-02

Next: O. Reg. 137/07, cl. 31 · ext (not in force until 2007-04-02) v1 →

OBC 2012 · renumbered to 4.1.5.14. — Pro

4.1.5.15. — Loads on Guards

(1) The minimum specified horizontal load applied inward or outward at the top of every required guard shall be,

(a) 3.0 kN/m for means of egress in grandstands, stadia, bleachers and arenas,

(b) a concentrated load of 1.0 kN applied at any point for access ways to equipment platforms, contiguous stairs and similar areas where the gathering of many people is improbable, and

(c) 0.75 kN/m or a concentrated load of 1.0 kN applied at any point, whichever governs for locations other than those described in Clauses (a) and (b).

(2) Individual elements within the guard, including solid panels and pickets, shall be designed for a load of 0.5 kN applied over an area of 100 mm by 100 mm located at any point in the element or elements so as to produce the most critical effect.

(3) The loads required in Sentence (2) need not be considered to act simultaneously with the loads provided for in Sentences (1) and (4).

(4) The minimum specified load applied vertically at the top of every required guard shall be 15 kN/m and need not be considered to act simultaneously with the horizontal load provided for in Sentence (1).

(5) For loads on handrails, refer to Sentence 3.4.6.4.(9).