(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
(7) Subsection 7 (3) and sections 134, 180, 224 to 230, 235 and 239 come into force on January 1, 2012.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(7)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- C
- Provision
- 1.3.5.1.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
(7) Subsection 7 (3) and sections 134, 180, 224 to 230, 235 and 239 come into force on January 1, 2012.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(7)
Provenance
OBC 1997 · renumbered from 2.4.5.1. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 503/09, cl. 229(2) · ext v1 →
In force 2012-01-01
Next: O. Reg. 503/09, cl. 229(2) · ext (not in force until 2012-01-01) v1 →
OBC 2012 · continues as 1.3.5.1. — Pro
1.3.5.1. — Prescribed Notices
Comparing versions
Changed text stands out · unchanged is dimmed
v0 base
Earlier · viewing · 2006-12-31(1) This Article sets out the notices that are required under section 10.2 of the Act.
(2) The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates, the registered code agency of,
(a) readiness to construct footings,
(b) substantial completion of footings and foundations prior to commencement of backfilling,
(c) substantial completion of structural framing and ductwork and piping for heating and air-conditioning systems, if the building is within the scope of Part 9 of Division B,
(d) substantial completion of structural framing and roughing-in of heating, ventilation, air-conditioning and air-contaminant extraction equipment, if the building is not a building to which Clause (c) applies,
(e) substantial completion of insulation, vapour barriers and air barriers,
(f) substantial completion of all required fire separations and closures and all fire protection systems including standpipe, sprinkler, fire alarm and emergency lighting systems,
(g) substantial completion of fire access routes,
(h) readiness for inspection and testing of,
(i) building sewers and building drains,
(ii) water service pipes,
(iii) fire service mains,
(iv) drainage systems and venting systems,
(v) the water distribution system, and
(vi) plumbing fixtures and plumbing appliances,
(i) readiness for inspection of suction and gravity outlets, covers and suction piping serving outlets of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or a public spa,
(j) substantial completion of the circulation / recirculation system of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or public spa and substantial completion of the pool before it is first filled with water,
(k) readiness to construct the sewage system,
(l) substantial completion of the installation of the sewage system before the commencement of backfilling,
(m) substantial completion of installation of plumbing not located in a structure, before the commencement of backfilling, and
(n) completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.1.(2) or to permit occupancy under Sentence 1.3.3.2.(1), if the building or part of the building to be occupied is not fully completed.
v1 O. Reg. 503/09
Later · 2012-01-01(1) This Article sets out the notices that are required under section 10.2 of the Act.
(2) The person to whom a permit under section 8 of the Act is issued shall notify the chief building official or, where a registered code agency is appointed under the Act in respect of the construction to which the notice relates, the registered code agency of,
(a) readiness to construct footings,
(b) substantial completion of footings and foundations prior to commencement of backfilling,
(c) substantial completion of structural framing and ductwork and piping for heating and air-conditioning systems, if the building is within the scope of Part 9 of Division B,
(d) substantial completion of structural framing and roughing-in of heating, ventilation, air-conditioning and air-contaminant extraction equipment, if the building is not a building to which Clause (c) applies,
(e) substantial completion of insulation and vapour barriers,
(e.1) substantial completion of air barrier systems,
(f) substantial completion of all required fire separations and closures and all fire protection systems including standpipe, sprinkler, fire alarm and emergency lighting systems,
(g) substantial completion of fire access routes,
(h) readiness for inspection and testing of,
(i) building sewers and building drains,
(ii) water service pipes,
(iii) fire service mains,
(iv) drainage systems and venting systems,
(v) the water distribution system, and
(vi) plumbing fixtures and plumbing appliances,
(i) readiness for inspection of suction and gravity outlets, covers and suction piping serving outlets of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or a public spa,
(j) substantial completion of the circulation / recirculation system of an outdoor pool described in Clause 1.3.1.1.(1)(j) of Division A, a public pool or public spa and substantial completion of the pool before it is first filled with water,
(k) readiness to construct the sewage system,
(l) substantial completion of the installation of the sewage system before the commencement of backfilling,
(m) substantial completion of installation of plumbing not located in a structure, before the commencement of backfilling,
(n) completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.1.(2) or to permit occupancy under Sentence 1.3.3.2.(1), if the building or part of the building to be occupied is not fully completed, and
(o) completion of construction and installation of components required to permit the issue of an occupancy permit under Sentence 1.3.3.4.(5).
Provenance
OBC 1997 · renumbered from 2.4.5.1. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 503/09, cl. 229(2) · ext v1 →
In force 2012-01-01 comparing ×
Next: O. Reg. 503/09, cl. 229(2) · ext (not in force until 2012-01-01) v1 →
OBC 2012 · continues as 1.3.5.1. — Pro