(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 9.30.6.4.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next one commenced. What follows is that next version’s commencement — the event that ended this one.
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
Provenance
OBC 1997 · continues from 9.30.6.4. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 503/09, cl. 187 · ext v1 →
In force 2010-01-01
Next: O. Reg. 503/09, cl. 187 · ext (not in force until 2010-01-01) v1 →
Discontinued — no OBC 2012 successor
9.30.6.4. — Ceramic Tile Applied to Mortar Bed with Adhesive
(1) When ceramic tile is applied to a mortar bed with adhesive, the bed shall be not less than 12.5 mm thick.
(2) The mortar bed described in Sentence (1) shall consist of by volume,
(a) 1 part Portland cement,
(b) 3 parts sand, and
(c) 1 part water.
(3) At least one layer of galvanized diamond mesh wire lath shall be imbedded in the mortar bed.
(4) Joints in the wire lath required by Sentence (3) shall be overlapped not less than 12 mm.
(5) The wire lath required in Sentence (3) shall be fastened to the subfloor with,
(a) lath nails not less than 38 mm length spaced not more than 150 mm o.c., or
(b) staples not less than 38 mm in length spaced not more than 150 mm o.c.
(6) Asphalt sheathing paper, felt or polyethylene film shall be applied between the mortar bed and the wood subfloor.
(7) Floor joists supporting the mortar bed described in Sentence (1) shall,
(a) be spaced not more than 400 mm o.c., and
(b) have no fewer than two rows of 38 mm × 38 mm cross bridging.
(8) The tile joints for the ceramic tile in Sentence (1) shall be grouted with cement grout which shall be compressed into joints between the tiles and then wiped smooth.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · continues from 9.30.6.4. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
O. Reg. 503/09, cl. 187 · ext v1 →
In force 2010-01-01 compare
Next: O. Reg. 503/09, cl. 187 · ext (not in force until 2010-01-01) v1 →
Discontinued — no OBC 2012 successor