9.28.6.5.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · continues from 9.28.6.5. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

OBC 2012 · continues as 9.28.6.5. — Pro

9.28.6.5. — Finish Coat

(1) When the finish coat is other than stone dash, the base shall be dampened but not saturated before the finish coat is applied.

(2) The thickness of the finish coat shall be not less than 3 mm.

(3) When a stone dash finish is used, the stone shall be partially embedded in the second coat before the second coat starts to set or stiffen.