CodeChronicle

OBC 2006 Division B

9.15.6.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · continues from 9.15.6. — Pro

Base · O. Reg. 350/06 · ext← current

Original — base regulation

OBC 2012 · continues as 9.15.6. — Pro

9.15.6. — Parging and Finishing of Foundation Walls

Content not available for this version.

9.15.6.1. — Foundation Walls Below Ground

(1) Concrete block foundation walls shall be parged on the exterior face below ground level as required in Section 9.13.

Text · e-Laws consolidated snapshot

9.15.6.2. — Foundation Walls Above Ground

(1) Exterior surfaces of concrete block foundation walls above ground level shall have tooled joints, or shall be rendered, parged or otherwise suitably finished.

Text · e-Laws consolidated snapshot

9.15.6.3. — Form Ties

(1) All form ties shall be removed at least flush with the concrete surface.

Text · e-Laws consolidated snapshot