240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 8.3.4.1.
- Version
- v1
240. (1) Subject to subsections (2), (3), (4), (5), (6) and (7), this Regulation comes into force on the later of January 1, 2010 and the day this Regulation is filed.
Read directly from the regulation's own commencement section.
O. Reg. 503/09 · commencement 240(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
Provenance
OBC 1997 · continues from 8.3.4.1. — Pro
Base · O. Reg. 350/06 · ext v0 →
O. Reg. 503/09, cl. 119(2) · ext ← current
In force 2010-01-01
OBC 2012 · continues as 8.3.4.1. — Pro
8.3.4.1. — Construction Requirements
(1) A privy vault or a pail privy shall be constructed in the following manner:
(a) the container or structure that is to be used for the holding or storage of sanitary sewage shall be watertight and made of a material that can be easily cleaned,
(b) the soil or leaching bed fill around the base of the sides of the superstructure shall be raised or mounded to a height of at least 150 mm above ground level, and
(c) the surface of the ground in the area of the privy vault or pail privy shall be so graded that surface drainage will be diverted away from the privy.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · continues from 8.3.4.1. — Pro
Base · O. Reg. 350/06 · ext v0 → compare
O. Reg. 503/09, cl. 119(2) · ext ← current
In force 2010-01-01
OBC 2012 · continues as 8.3.4.1. — Pro