CodeChronicle

OBC 2006 Division B

7.5.8.5.

Version 0 — in force 31 December 2006

In force
Verified · covered Verified against the 2006-12-31–2007-04-01 consolidation, whose range covers the query date. How to read this

Provenance

New in this edition — no OBC 1997 predecessor

Base · O. Reg. 350/06 · ext← current

Original — base regulation

OBC 2012 · continues as 7.5.8.5. — Pro

7.5.8.5. — Lengths for other Vent Pipes

(1) When sizing an additional circuit vent, offset relief vent, relief vent, yoke vent and the vent pipe for an interceptor, dilution tank, sanitary sewage tank or sump, or manhole, length is not taken into consideration.

Text · e-Laws consolidated snapshot