CodeChronicle

OBC 2006 Division B

4.2.4.9.

Version 1 — in force 1 January 2010

In force · amended
Verified · covered Verified against the 2010-01-01–2010-03-31 consolidation, whose range covers the query date. How to read this

Provenance

OBC 1997 · renumbered from 4.2.4.11. — Pro

Base · O. Reg. 350/06 · ext v0 →

O. Reg. 503/09, cl. 63 · ext ← current

In force 2010-01-01

OBC 2012 · continues as 4.2.4.9. — Pro

4.2.4.9. — Groundwater Level Change

Comparing versions

Changed text stands out · unchanged is dimmed

v0 base

Earlier · 2006-12-31

(1) Where proposed construction will result in a temporary or permanent change in the groundwater level, the effects of this change on adjacent buildings shall be fully investigated and provided for in the design.

v1 O. Reg. 503/09

Later · viewing · 2010-01-01

(1) Where proposed construction will result in a temporary or permanent change in the groundwater level, the effects of this change on adjacent buildings shall be fully investigated and provided for in the design.