OBC 2006 › Division B
3.13.3.4.
Version 0 — in force 31 December 2006
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 3.13.3.4.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
This looks wrong
Tell us what is wrong and we will verify & correct our mapping.
- Edition
- OBC_2006
- Division
- B
- Provision
- 3.13.3.4.
- Version
- v0
(1) This Regulation comes into force on December 31, 2006.
Read directly from the regulation's own commencement section.
O. Reg. 350/06 · commencement 2.2.1.1(1)
This version stayed in force until the next edition replaced it. What follows is that edition’s base regulation’s commencement — the takeover that ended this one.
(1) Subject to Sentences (2) and (3), this Regulation comes into force on January 1, 2014.
Read directly from the regulation's own commencement section.
O. Reg. 332/12 · commencement 4.4.1.1(1)
Provenance
OBC 1997 · renumbered from 3.12.3.4. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
OBC 2012 · continues as 3.13.3.4. — Pro
3.13.3.4. — Leased Areas
(1) All leased areas within a rapid transit station shall be,
(a) sprinklered, and
(b) separated from the remainder of the floor area by a fire separation of noncombustible construction that is not required to have a fire-resistance rating.
(2) A door acting as a closure in the fire separation in Clause (1)(b) is not required to be equipped with a self-closing device.
(3) Where leased areas are located on opposite sides of a means of egress, the width of the means of egress shall not be reduced to less than 5 m.
(4) Except as provided in Sentence (5), where the leased area on any floor level exceeds 15% of the public area on that level, the public area shall be sprinklered.
(5) In a rapid transit station that is erected entirely above the adjoining finished ground level and is a stand-alone building, where the leased area on any floor level exceeds 20% of the public area on that level, the public area shall be sprinklered.
(6) In determining the leased area in Sentences (4) and (5), it is not necessary to include a leased area that is separated from the public area by a fire separation having a fire-resistance rating not less than,
(a) 2 h where the leased area contains a mercantile or medium hazard industrial occupancy, or
(b) 1 h where the leased area contains any other occupancy.
(7) A leased area is permitted on a platform level provided it is,
(a) located not less than 5 m from the platform edge,
(b) located not less than 5 m from an egress facility, and
(c) not located in a dead end portion of the platform.
Text · e-Laws consolidated snapshot
Provenance
OBC 1997 · renumbered from 3.12.3.4. — Pro
Base · O. Reg. 350/06 · ext← current
Original — base regulation
OBC 2012 · continues as 3.13.3.4. — Pro